【Test items】
The flow rate of Pressure Testing Equipment under test can reach the temperature required to ensure a constant temperature. Before starting the test, the maximum flow rate of each device under test must be agreed with the corresponding department, and the example must be recorded.
Corrosion in Pressure Testing Equipment under test caused by flow is not allowed.
【Technical parameters】
Number of devices under test: 4 new parts
Temperature: 107℃-110℃
System pressure: 1.5 bar overpressure, control of test media throughout the duration of the test, 60% coolant additive mixture TL774 and 40% water test duration 1500h
Program heating cycle
1. Heat the heating unit to 110 ° C
2. After 170 hours, cool it to room temperature
3. Store at room temperature for 1 hour, replace the existing test medium with a new test medium
4. Heat to 110 ° C
5. Check the sealing
Hot Tags: Pressure Testing Equipment, China, manufacturers, suppliers, factory, customized, buy, price, cheap, new energy vehicle adaptive cruise control system testing equipment, Pressure Impulse Endurance Test Stand, Electric Water Pump Pressure Test Stand, Compressor Burst Test Stand, Compressive Strength Testing Machine, High Temperature Burst Test Stand


